skip to main content
Primo Advanced Search
Primo Advanced Search Query Term
Primo Advanced Search Query Term
Primo Advanced Search Query Term
Primo Advanced Search prefilters
Resultados 1 2 3 4 5 next page
Mostrar Somente
Refinado por: assunto: Optimization remover assunto: Scheduling remover
Result Number Material Type Add to My Shelf Action Record Details and Options
1
Empty Pallet Allocation Optimization in Shipbuilding Using a Pallet Pool System
Material Type:
Artigo
Adicionar ao Meu Espaço

Empty Pallet Allocation Optimization in Shipbuilding Using a Pallet Pool System

Yu, Hao ; Yang, Jiaqi ; Kang, Xipei ; Cong, Zhe ; Yao, Siwei

Sustainability, 2022-05, Vol.14 (9), p.5479 [Periódico revisado por pares]

Basel: MDPI AG

Texto completo disponível

2
Surface Ship Drydock Schedule Planner
Material Type:
Artigo
Adicionar ao Meu Espaço

Surface Ship Drydock Schedule Planner

Hilliard, Adam ; Lin, Kyle Y. ; Sparks, Robert D.

Naval engineers journal, 2020-03, Vol.132 (1), p.63-72 [Periódico revisado por pares]

Alexandria: American Society of Naval Engineers

Texto completo disponível

3
Increasing Collegiate Flight Training Fleet Utilization Through the Use of an Aircraft Assignment Algorithm
Material Type:
Artigo
Adicionar ao Meu Espaço

Increasing Collegiate Flight Training Fleet Utilization Through the Use of an Aircraft Assignment Algorithm

Mott, John ; Henao, Daniel ; Hodgen, Mitchell ; Bullock, Darcy

International journal of aviation, aeronautics, and aerospace, 2016, Vol.3 (3), p.5 [Periódico revisado por pares]

Daytona Beach: Embry-Riddle Aeronautical University, Worldwide

Texto completo disponível

4
Optimizing Department of Defense Acquisition Development Test and Evaluation Scheduling
Material Type:
Report
Adicionar ao Meu Espaço

Optimizing Department of Defense Acquisition Development Test and Evaluation Scheduling

Edwards, Shane A

2015

Texto completo disponível

5
Littoral Combat Ship Crew Scheduling
Material Type:
Report
Adicionar ao Meu Espaço

Littoral Combat Ship Crew Scheduling

Fitzsimmons, Van R

2015

Texto completo disponível

6
USN Manpower Determination Decision Making: A Case Study Using Imprint Pro to Validate the LCS Core Crew Manning Solution
Material Type:
Report
Adicionar ao Meu Espaço

USN Manpower Determination Decision Making: A Case Study Using Imprint Pro to Validate the LCS Core Crew Manning Solution

Hollins, Renaldo N ; Leszczynski, Kelly M

2014

Texto completo disponível

7
Monterey Bay Aquarium Volunteer Guide Scheduling Analysis
Material Type:
Report
Adicionar ao Meu Espaço

Monterey Bay Aquarium Volunteer Guide Scheduling Analysis

Baxa, Philip S

2014

Texto completo disponível

8
Heuristics for flight and maintenance planning of mission aircraft
Material Type:
Artigo
Adicionar ao Meu Espaço

Heuristics for flight and maintenance planning of mission aircraft

Kozanidis, George ; Gavranis, Andreas ; Liberopoulos, George

Annals of operations research, 2014-10, Vol.221 (1), p.211-238 [Periódico revisado por pares]

Boston: Springer US

Texto completo disponível

9
General Loss Function Applied to Satellite Scheduling Optimization
Material Type:
Report
Adicionar ao Meu Espaço

General Loss Function Applied to Satellite Scheduling Optimization

Kinney, Mark D

2014

Texto completo disponível

10
Optimization of Continuous Maintenance Availability Scheduling
Material Type:
Report
Adicionar ao Meu Espaço

Optimization of Continuous Maintenance Availability Scheduling

Anderson, Cyrus K

2014

Texto completo disponível

Resultados 1 2 3 4 5 next page

Personalize Seus Resultados

  1. Editar

Refine Search Results

Expandir Meus Resultados

  1.   

Mostrar Somente

  1. Recursos Online (107)
  2. Revistas revisadas por pares (6)

Refinar Meus Resultados

Tipo de Recurso 

  1. Reports  (102)
  2. Recursos Textuais  (10)
  3. Artigos  (9)
  4. Mais opções open sub menu

Data de Publicação 

De até
  1. Antes de1981  (10)
  2. 1981Até1989  (18)
  3. 1990Até1998  (39)
  4. 1999Até2008  (33)
  5. Após 2008  (22)
  6. Mais opções open sub menu

Buscando em bases de dados remotas. Favor aguardar.