Result Number | Material Type | Add to My Shelf Action | Record Details and Options |
---|---|---|---|
1 |
Material Type: Dataset
|
A COMPARATIVE STUDY OF INVENTORY MODELLING: DETERMINISTIC OVER STOCHASTIC APPROACHLalji Kumar ; Ghoshi, Pratima Singh ; Shreyashi Saxena ; Sharma, KajalReliability: Theory & Applications 2024Texto completo disponível |
|
2 |
Material Type: Dataset
|
Artificial Intelligence based optimization of follow-up for cancer patientsChristoph Bauer, DE-ForchheimSiemens AG 2019Sem texto completo |
|
3 |
Material Type: Dataset
|
Dual Synchronized Axes Optimization MethodKai Jiang, CN-NanjingSiemens AG 2018Sem texto completo |
|
4 |
Material Type: Dataset
|
Automatic MR Sequence Optimization on MRI ScannerXiao Chen, US-Princeton, New Jersey; Dr. Mariappan S. Nadar, US-Princeton, New Jersey; Benjamin Odry, US-Princeton, New Jersey; Boris Mailhé, US-Princeton, New JerseySiemens AG 2018Sem texto completo |
|
5 |
Material Type: Dataset
|
ETSPTW and ETSPTW-MCR problem set, and details of the computational resultsKüçükoğlu, İlkerMendeley 2017Texto completo disponível |
|
6 |
Material Type: Dataset
|
Structural Design Optimization of Steel Beams and Frames with Web-Tapered Members Using the PSO-FEM AlgorithmSYCH, Piotr ; SŁOŃSKI, MarekComputer Assisted Methods in Engineering and Science, 28: 39-55 2021Texto completo disponível |
|
7 |
Material Type: Dataset
|
Michell Structures within L-Shaped DomainsBOŁBOTOWSKI, Karol ; LEWIŃSKI, Tomasz ; SOKÓŁ, TomaszComputer Assisted Methods in Engineering and Science, 27(2–3): 185–204 2020Sem texto completo |
|
8 |
Material Type: Dataset
|
Reliability Optimization Using Heuristic Algorithm In Pharmaceutical PlantDahiya, Tripti ; Garg, Deepika ; Devi, Sarita ; Kumar, RakeshReliability: Theory & Applications 2021Texto completo disponível |
|
9 |
Material Type: Dataset
|
Heuristics applying stochastic information as tools for thermoacoustic standing-wave engine optimizationNOWAK, IwonaComputer Assisted Methods in Engineering and Science, 25, 3–19 2018Sem texto completo |
|
10 |
Material Type: Dataset
|
Benchmark instances for the preemptive single machine scheduling of equal-length jobs minimizing Total Weighted Completion TimeFomin, ArtemMendeley Data 2024Texto completo disponível |