Result Number | Material Type | Add to My Shelf Action | Record Details and Options |
---|---|---|---|
1 |
Material Type: Artigo
|
A LoRaWAN Multi-Technological Architecture for Construction Site MonitoringRagnoli, Mattia ; Colaiuda, Davide ; Leoni, Alfiero ; Ferri, Giuseppe ; Barile, Gianluca ; Rotilio, Marianna ; Laurini, Eleonora ; De Berardinis, Pierluigi ; Stornelli, VincenzoSensors (Basel, Switzerland), 2022-11, Vol.22 (22), p.8685 [Periódico revisado por pares]Switzerland: MDPI AGTexto completo disponível |
|
2 |
Material Type: Artigo
|
Optimal process integration architectures in off-site construction: Theorizing the use of multi-skilled resourcesArashpour, Mehrdad ; Wakefield, Ron ; Abbasi, Babak ; Arashpour, Mohammadreza ; Hosseini, RezaArchitectural engineering and design management, 2018-03, Vol.14 (1-2), p.46-59 [Periódico revisado por pares]London: Taylor & FrancisTexto completo disponível |
|
3 |
Material Type: Artigo
|
BIM Approach in Construction Safety—A Case Study on Preventing Falls from HeightRodrigues, Fernanda ; Baptista, João Santos ; Pinto, DéboraBuildings (Basel), 2022-01, Vol.12 (1), p.73 [Periódico revisado por pares]Basel: MDPI AGTexto completo disponível |
|
4 |
Material Type: Artigo
|
The The Influence of Construction Site Internships in Architecture Education: A Study on Kolb’s Experiential Learning TheoryErbas, IkbalProstor (Zagreb, Croatia), 2023-01, Vol.31 (2(66)), p.298-313 [Periódico revisado por pares]Sveuciliste U ZagrebuTexto completo disponível |
|
5 |
Material Type: Artigo
|
Enriching BIM with Unmanned Aerial Systems Data for Enhancing Construction Management OperationsRahnamayiezekavat, Payam ; Mourad, Mohamed ; Mostafa, Sherif ; Moon, Sungkon ; Senaratne, SepaniSustainability, 2022-09, Vol.14 (18), p.11362 [Periódico revisado por pares]Basel: MDPI AGTexto completo disponível |
|
6 |
Material Type: Artigo
|
Sustainable Recovery of Architectural Heritage: The Experience of a Worksite School in San SalvadorSantini, Silvia ; Borghese, Vittoria ; Micheli, Mario ; Orellana Paz, ErickSustainability, 2022-01, Vol.14 (2), p.608 [Periódico revisado por pares]Basel: MDPI AGTexto completo disponível |
|
7 |
Material Type: Artigo
|
Two-Step Alignment of Mixed Reality Devices to Existing Building DataVermandere, Jelle ; Bassier, Maarten ; Vergauwen, MaartenRemote sensing (Basel, Switzerland), 2022-06, Vol.14 (11), p.2680 [Periódico revisado por pares]Basel: MDPI AGTexto completo disponível |
|
8 |
Material Type: Artigo
|
Exploratory study of using unmanned aerial system imagery for construction site 3D mappingÁlvares, Juliana Sampaio ; Costa, Dayana Bastos ; Melo, Roseneia Rodrigues Santos deConstruction innovation, 2018-07, Vol.18 (3), p.301-320 [Periódico revisado por pares]London: Emerald Publishing LimitedTexto completo disponível |
|
9 |
Material Type: Artigo
|
BIM and project planning integration for on-site safety inductionGanah, Abdulkadir A ; John, Godfaurd AJournal of engineering, design and technology, 2017-06, Vol.15 (3), p.341-354 [Periódico revisado por pares]Bingley: Emerald Group Publishing LimitedTexto completo disponível |
|
10 |
Material Type: Artigo
|
Guest editorialEl-Khouly, Tamir ; Abdelmohsen, Sherif ; Zaki MallasiOpen house international, 2021-01, Vol.46 (3), p.342-347 [Periódico revisado por pares]Gateshead: Emerald Group Publishing LimitedTexto completo disponível |