Result Number | Material Type | Add to My Shelf Action | Record Details and Options |
---|---|---|---|
1 |
Material Type: Artigo
|
新建海底天然气管道干空气干燥模型研究曹学文 ; 王立洋 ; 林宗虎石油科学(英文版), 2005, Vol.2 (4), p.56-61 [Periódico revisado por pares]Faculty of Architecture & Storage Engineering, China University of Petroleum, Dongying 257061, China%Faculty of Architecture & Storage Engineering, China University of Petroleum, Dongying 257061, China%School of Energy and Power Engineering, Xi'an Jiaotong University, Xi'an 710049, ChinaSem texto completo |
|
2 |
Material Type: Artigo
|
The Cognitive Neuropsychology of Reading and Writing in Chinese尹文剛(Yin, Wen-gang ) ; 蘇逸凡(Su, I-fan ) ; 陳美珍( Chen, May-jane)Language and linguistics (Taipei), 2006-07, Vol.7 (3), p.595-617 [Periódico revisado por pares]台灣: 中央研究院語言學研究所Texto completo disponível |
|
3 |
Material Type: Artigo
|
房地产企业竞争情报体系的构建研究黄文娟知识管理论坛, 2010 (9), p.10-14 [Periódico revisado por pares]Sem texto completo |
|
4 |
Material Type: Artigo
|
A Simulation Model for Spatial Scheduling of Dynamic Block Assembly in ShipbuildingLiu, Zhuo ; Chua, David K. H. ; Keng, Hwee WeeJournal of Engineering, Project, and Production Management, 2011-01, Vol.1 (1), p.003-012 [Periódico revisado por pares]其他: Journal of Engineering, Project, and Production ManagementTexto completo disponível |
|
5 |
Material Type: Artigo
|
Building Information Modeling and Integrated Project Delivery in the Commercial Construction Industry: A Conceptual StudyIlozor, Benedict D. ; Kelly, David J.Journal of Engineering, Project, and Production Management, 2012-01, Vol.2 (1), p.023-036 [Periódico revisado por pares]其他: Journal of Engineering, Project, and Production ManagementTexto completo disponível |
|
6 |
Material Type: Artigo
|
Determination of Optimum Frame Rates for Observation of Construction Operations from Time-Lapse MoviesIbrahim, Y. M. ; Ibrahim, A. D. ; Chindo, P. G.Journal of Engineering, Project, and Production Management, 2012-07, Vol.2 (2), p.057-065 [Periódico revisado por pares]其他: Journal of Engineering, Project, and Production ManagementTexto completo disponível |
|
7 |
Material Type: Artigo
|
Structure of Classifiers and Measure Words: A Lexical Functional Account何萬順(Her, One-soon)Language and linguistics (Taipei), 2012-10, Vol.13 (6), p.1211-1251 [Periódico revisado por pares]台灣: 中央研究院語言學研究所Texto completo disponível |
|
8 |
Material Type: Artigo
|
Production Cells in Construction: Considering Time, Space and Information Linkages to Seek Broader ImplementationsMariz, R. N. ; Picchi, F. A. ; Granja, A. D. ; Melo, R. S. S.Journal of Engineering, Project, and Production Management, 2013-01, Vol.3 (1), p.046-055 [Periódico revisado por pares]其他: Journal of Engineering, Project, and Production ManagementTexto completo disponível |
|
9 |
Material Type: Artigo
|
Structural Insulated Panels: Past, Present, and FuturePanjehpour, M. ; Ali, A. A. A. ; Voo, Y. L.Journal of Engineering, Project, and Production Management, 2013-01, Vol.3 (1), p.002-008 [Periódico revisado por pares]其他: Journal of Engineering, Project, and Production ManagementTexto completo disponível |
|
10 |
Material Type: Artigo
|
A Framework for Improving Project Performance of Standard Design Models in Saudi ArabiaOtaibi, S ; Osmani, M ; Price, A D FJournal of Engineering, Project, and Production Management, 2013-07, Vol.3 (2), p.085-098 [Periódico revisado por pares]其他: Journal of Engineering, Project, and Production ManagementTexto completo disponível |