Result Number | Material Type | Add to My Shelf Action | Record Details and Options |
---|---|---|---|
1 |
Material Type: Article
|
![]() |
Risk identification and mitigation for architectural, engineering, and construction firms operating in the Gulf regionAbdul-Rahman, Hamzah ; Loo, Siaw Chuing ; Wang, ChenCanadian journal of civil engineering, 2012, Vol.39 (1), p.55-71 [Peer Reviewed Journal]Ottawa, ON: National Research Council of CanadaFull text available |
2 |
Material Type: Article
|
![]() |
Systemic integrated method as the basis for high-quality planning of construction productionAbramov, I.L.IOP conference series. Materials Science and Engineering, 2019-09, Vol.603 (5), p.52077 [Peer Reviewed Journal]Bristol: IOP PublishingFull text available |
3 |
Material Type: Article
|
![]() |
Importance and ranking evaluation of delay factors for development construction projects in BeninAkogbe, Romuald-Kokou T. M. ; Feng, Xin ; Zhou, JingKSCE Journal of Civil Engineering, 2013, 17(6), , pp.1213-1222 [Peer Reviewed Journal]Berlin/Heidelberg: Springer Berlin HeidelbergFull text available |
4 |
Material Type: Article
|
![]() |
Design and construction risks in BOT type mega transportation projectsAladağ, Hande ; Işık, ZeynepEngineering, construction, and architectural management, 2019-09, Vol.26 (10), p.2223-2242 [Peer Reviewed Journal]Bradford: Emerald Publishing LimitedFull text available |
5 |
Material Type: Article
|
![]() |
The significant factors causing delay of building construction projects in MalaysiaAlaghbari, Wa'el ; Razali A. Kadir, Mohd ; Salim, Azizah ; ErnawatiEngineering, construction, and architectural management, 2007-01, Vol.14 (2), p.192-206 [Peer Reviewed Journal]Bradford: Emerald Group Publishing LimitedFull text available |
6 |
Material Type: Article
|
![]() |
What is architectural management? Towards a pragmatic definitionAlharbi, Mohammed ; Emmitt, Stephen ; Demian, PeterEngineering, construction, and architectural management, 2015-03, Vol.22 (2), p.151-168 [Peer Reviewed Journal]Bradford: Emerald Group Publishing LimitedFull text available |
7 |
Material Type: Article
|
![]() |
Health and safety coordinators in building projectsAlmén, Lena ; Larsson, Tore JBuilt environment project and asset management, 2014-07, Vol.4 (3), p.251-263 [Peer Reviewed Journal]Bingley: Emerald Group Publishing LimitedFull text available |
8 |
Material Type: Article
|
![]() |
Integrated project delivery implementation framework for water and wastewater treatment plant projectsAndary, Elie Georges ; Abi Shdid, Caesar ; Chowdhury, Arindam ; Ahmad, IrtishadEngineering, construction, and architectural management, 2020-04, Vol.27 (3), p.609-633 [Peer Reviewed Journal]Bradford: Emerald Publishing LimitedFull text available |
9 |
Material Type: Article
|
![]() |
Building Information Modeling in Steel Building Projects Following BIM-DFE Methodology: A Case StudyAvendaño, José Ignacio ; Domingo, Alberto ; Zlatanova, SisiBuildings (Basel), 2023-09, Vol.13 (9), p.2137 [Peer Reviewed Journal]Basel: MDPI AGFull text available |
10 |
Material Type: Article
|
![]() |
A framework for an automated and integrated project monitoring and control system for steel fabrication projectsAzimi, Reza ; Lee, SangHyun ; AbouRizk, Simaan M. ; Alvanchi, AminAutomation in construction, 2011, Vol.20 (1), p.88-97 [Peer Reviewed Journal]Kidlington: Elsevier B.VFull text available |