skip to main content

The hardness of making. The praxis in the urban development by Saturnino de Brito from its sanitation plan for the city of Santos (1905-1910); La dureza de hacer. Praxis en la urbanistica de Saturnino de Brito desde su plan de saneamiento de la ciudad de Santos (1905-1910); A dureza do fazer. A práxis na urbanística de Saturnino de Brito a partir do seu plano de saneamento para a cidade de Santos (1905-1910)

Bernardini, Sidney Piochi

Risco Revista de Pesquisa em Arquitetura e Urbanismo (Online); Nr. 22 (2015); 47-62

Universidade de São Paulo. Instituto de Arquitetura e Urbanismo 2016-12-19

Acesso online

  • Título:
    The hardness of making. The praxis in the urban development by Saturnino de Brito from its sanitation plan for the city of Santos (1905-1910); La dureza de hacer. Praxis en la urbanistica de Saturnino de Brito desde su plan de saneamiento de la ciudad de Santos (1905-1910); A dureza do fazer. A práxis na urbanística de Saturnino de Brito a partir do seu plano de saneamento para a cidade de Santos (1905-1910)
  • Autor: Bernardini, Sidney Piochi
  • Assuntos: Saturnino De Brito; Urbanismo Moderno; Saneamento; Saturnino De Brito; Saneamiento; Modern Urbanism; Sanitation
  • É parte de: Risco Revista de Pesquisa em Arquitetura e Urbanismo (Online); Nr. 22 (2015); 47-62
  • Descrição: O artigo pretende discutir a atuação do engenheiro sanitarista Saturnino de Brito durante o período que chefiou a Comissão de Saneamento de Santos do governo estadual de São Paulo, entre 1905 e 1910. Brito foi incumbido de realizar as obras de saneamento daquela cidade que, por longos anos, havia sido assolada por epidemias de febre amarela, dizimando parte de sua população. Ao enfrentar uma série de obstáculos e dificuldades que foram interpostos durante o processo de execução destas obras, a conduta do engenheiro demonstrou a sua habilidade em combinar conhecimentos variados para lidar com as problemáticas intrínsecas ao plano desenvolvido.
    This paper intends to discuss the performance of the sanitary engineer Saturnino de Brito over the period in which he was the chief of Sanitation Commission of Santos in the estate government of São Paulo. Brito was responsible to carry out the sanitation works of the city that for long years, had been laid waste by yellow fever epidemics, decimating part of his population. To face a set of obstacles and difficulties brought during the execution process of these works, the behavior of the engineer proved his skill in combine diverse knowledge to lead with the intrinsic issues of the developed plan.
    El artículo analiza el desempeño del ingeniero sanitario Saturnino de Brito durante el período que llevó a la Comisión de Saneamiento Santos del gobierno del estado de Sao Paulo, entre 1905 y 1910. Brito fue el responsable de la ejecución de las obras de saneamiento de la ciudad que por mucho tiempo años, habían sido devastadas por las epidemias de fiebre amarilla, diezmando a parte de su población. Cuando se enfrenta a una serie de obstáculos y dificultades que se presentaron durante el proceso de ejecución de estas obras, la conducta del ingeniero demostró su capacidad de combinar diferentes conocimientos para hacer frente a los problemas inherentes al plan desarrollado.
  • Títulos relacionados: https://www.revistas.usp.br/risco/article/view/124541/121044
  • Editor: Universidade de São Paulo. Instituto de Arquitetura e Urbanismo
  • Data de criação/publicação: 2016-12-19
  • Formato: Adobe PDF
  • Idioma: Português

Buscando em bases de dados remotas. Favor aguardar.