skip to main content
Visitante
Meu Espaço
Minha Conta
Sair
Identificação
This feature requires javascript
Tags
Revistas Eletrônicas (eJournals)
Livros Eletrônicos (eBooks)
Bases de Dados
Bibliotecas USP
Ajuda
Ajuda
Idioma:
Inglês
Espanhol
Português
This feature required javascript
This feature requires javascript
Primo Advanced Search
Busca Geral
Busca Geral
Acervo Físico
Acervo Físico
Produção Intelectual da USP
Produção USP
Primo Advanced Search Query Term
Input search text:
Show Results with:
criteria input
Qualquer
Show Results with:
Qualquer
Primo Advanced Search prefilters
Tipo de material:
criteria input
Todos os itens
Busca Geral
Busca Simples
This feature requires javascript
Tennessee Valley Authority; Browns Ferry Nuclear Plant, Units 1, 2, and 3
The Federal Register / FIND, 2016, Vol.81 (231), p.86732
Washington: Federal Information & News Dispatch, LLC
Texto completo disponível
Citações
Citado por
Exibir Online
Detalhes
Resenhas & Tags
Mais Opções
Nº de Citações
This feature requires javascript
Enviar para
Adicionar ao Meu Espaço
Remover do Meu Espaço
E-mail (máximo 30 registros por vez)
Imprimir
Link permanente
Referência
EasyBib
EndNote
RefWorks
del.icio.us
Exportar RIS
Exportar BibTeX
This feature requires javascript
Título:
Tennessee Valley Authority; Browns Ferry Nuclear Plant, Units 1, 2, and 3
É parte de:
The Federal Register / FIND, 2016, Vol.81 (231), p.86732
Descrição:
Draft environmental assessment and draft finding of no significant impact; request for comment. Citation: "81 FR 86732" Document Number: "Docket Nos. 50-259, 50-260, and 50-296; NRC-2016-0244" Page Number: "86732" "Notices" SUMMARY: The U.S. Nuclear Regulatory Commission (NRC) is considering issuance of amendments to Renewed Facility Operating License Nos. DPR-33, DPR-52, and DPR-68 issued to Tennessee Valley Authority (TVA, the licensee) for operation of Browns Ferry Nuclear Plant, Units 1, 2, and 3 (BFN) located in Limestone County, Alabama. The proposed amendments would increase the maximum licensed thermal power level for each reactor from 3,458 megawatts thermal (MWt) to 3,952 MWt. This change, referred to as an extended power uprate (EPU), represents an increase of approximately 14.3 percent above the current licensed thermal power limit. The NRC is issuing a draft environmental assessment (EA) and draft finding of no significant impact (FONSI) for public comment associated with the proposed EPU.
Editor:
Washington: Federal Information & News Dispatch, LLC
Idioma:
Inglês
This feature requires javascript
This feature requires javascript
Voltar para lista de resultados
Anterior
Resultado
8
Avançar
This feature requires javascript
This feature requires javascript
Buscando em bases de dados remotas. Favor aguardar.
Buscando por
em
scope:(USP_VIDEOS),scope:("PRIMO"),scope:(USP_FISICO),scope:(USP_EREVISTAS),scope:(USP),scope:(USP_EBOOKS),scope:(USP_PRODUCAO),primo_central_multiple_fe
Mostrar o que foi encontrado até o momento
This feature requires javascript
This feature requires javascript