BIM Modelling to budgeting using SINAPI; BIM para presupuestar con uso de SINAPI; Modelagem BIM para orçamentação com uso do SINAPI

Andrade, Felipe Miguel Rocha; Biotto, Clarissa Notariano; Serra, Sheyla Mara Baptista

Gestão & Tecnologia de Projetos; v. 16 n. 2 (2021): Abril a Junho de 2021; 93-111

Universidade de São Paulo. Instituto de Arquitetura e Urbanismo 2021-03-12

Acesso online

  • Título:
    BIM Modelling to budgeting using SINAPI; BIM para presupuestar con uso de SINAPI; Modelagem BIM para orçamentação com uso do SINAPI
  • Autor: Andrade, Felipe Miguel Rocha; Biotto, Clarissa Notariano; Serra, Sheyla Mara Baptista
  • Assuntos: Quantities Take-Off; Cost Estimation; Sinapi; Public Project; Construction Industry; Extracción Cuantitativa; Estimación De Costos; Obra Pública; Construcción Civil; Extração De Quantitativos; Estimativa De Custo; Construção Civil
  • É parte de: Gestão & Tecnologia de Projetos; v. 16 n. 2 (2021): Abril a Junho de 2021; 93-111
  • Descrição: El proceso de presupuestación para la licitación de una obra pública ocurre a través de la composición de costos unitarios y la búsqueda de precios de los insumos registrados en hojas de cálculo presupuestario. La fase inicial de este proceso es el relevamiento de las cantidades de materiales y servicios extraídos de los diferentes proyectos del edificio. Normalmente, la encuesta se realiza manualmente y puede tener fallas. Conscientes de esto y conociendo la importancia de la evaluación de costos para una empresa pública, sumada al Modelado de Información de Edificación (BIM) obligatorio en obra pública a partir de 2021, en este trabajo estudiamos la aplicación de BIM para la extracción de cantidades y precios vinculados a especificaciones. del Sistema Nacional de Investigación de Costos e Índices de la Construcción Civil (SINAPI). El método de investigación utilizado fue el estudio de caso de una obra pública. Para ello se utilizaron documentos de licitación, como la hoja de cálculo del presupuesto inicial y el proyecto básico de arquitectura CAD 2D. Se realizaron dos modelos BIM: el primero para la extracción de cantidades y comparación con datos de licitación; y el segundo para componer directamente los costos de albañilería estructural con base en los servicios del SINAPI. Finalmente, el estudio demostró similitud entre las cantidades extraídas del modelo BIM con el proceso de licitación manual, sin embargo, para poder utilizar los datos de costos del SINAPI, es necesario que el modelo sea elaborado con un enfoque específico en la presupuestación.
    The budgeting process for biding a public project occurs through the method of composition of unit costs using and research of prices of the inputs recorded in budget spreadsheets. The initial step of this process is the materials and services quantity take-off from drawings of the project. Usually, this process is performed manually and might be flawed. Aware of this and knowing the importance of cost evaluation for a public project, added to the mandatory use of Building Information Modelling (BIM) in public projects from 2021 onwards, in this work it was studied the application of BIM for quantitative take-off and budgeting based on specifications of the National System for Research of Costs and Indices for Civil Construction (SINAPI). The research method used was the case study of a public project. For this, bidding documents and 2D CAD projects were used. Two BIM models were developed: the first for quantities take-off and comparison with the bidding data; and the second to compose the costs of the structural masonry based on SINAPI. Finally, the study demonstrated similarity between quantities extracted from the BIM model with the manual bidding process, however, to use SINAPI cost data, it is necessary that the model be prepared with a specific focus on budgeting.
    O processo de orçamentação para licitação de uma obra pública ocorre por meio da composição de custos unitários e pesquisa de preços dos insumos registrados em planilhas orçamentárias. A fase inicial deste processo é o levantamento dos quantitativos de materiais e serviços extraídos dos diferentes projetos do edifício. Normalmente, o levantamento é realizado de forma manual e pode apresentar-se falho. Ciente disso e sabendo da importância da avaliação de custos para um empreendimento público, somado da obrigatóriedade do Building Information Modelling (BIM) em obras públicas a partir de 2021, neste trabalho estudou-se a aplicação do BIM para extração de quantitativos e precificação vinculada às especificações do Sistema Nacional de Pesquisa de Custos e Índices da Construção Civil (SINAPI). O método de pesquisa utilizado foi o estudo de caso de uma obra pública. Para isso, utilizou-se documentos da licitação, como a planilha orçamentária inicial e o projeto básico de arquitetura em CAD 2D. Foram feitas duas modelagens BIM: a primeira para a extração de quantitativos e comparação com dados da licitação; e a segunda para compor diretamente os custos da alvenaria estrutural baseado nos serviços do SINAPI. Por fim, o estudo demonstrou similaridade entre quantitativos extraídos do modelo BIM com o processo manual para a licitação, porém, para se utilizar os dados de custos do SINAPI é necessário que o modelo seja elaborado visando, especificamente, a orçamentação.
  • Títulos relacionados: https://www.revistas.usp.br/gestaodeprojetos/article/view/170318/168155
  • Editor: Universidade de São Paulo. Instituto de Arquitetura e Urbanismo
  • Data de criação/publicação: 2021-03-12