Result Number | Material Type | Add to My Shelf Action | Record Details and Options |
---|---|---|---|
1 |
Material Type: Artigo
|
![]() |
Modelling and analysis of nuclear reactor system coupled with a liquid metal batteryShigrekar, Amey ; Peng, Jiangkai ; Olowu, Temitayo O. ; Gallego Dias, Fernando ; Westover, TylerJournal of engineering (Stevenage, England), 2024-05, Vol.2024 (5), p.n/a [Periódico revisado por pares]WileyTexto completo disponível |
2 |
Material Type: Artigo
|
![]() |
Energy Storage Arbitrage Under Day-Ahead and Real-Time Price UncertaintyKrishnamurthy, Dheepak ; Uckun, Canan ; Zhi Zhou ; Thimmapuram, Prakash R. ; Botterud, AudunIEEE transactions on power systems, 2018-01, Vol.33 (1), p.84-93 [Periódico revisado por pares]IEEETexto completo disponível |
3 |
Material Type: Artigo
|
![]() |
Optimal sizing of a wind/solar/battery hybrid grid-connected microgrid systemAkram, Umer ; Khalid, Muhammad ; Shafiq, SaifullahIET renewable power generation, 2018-01, Vol.12 (1), p.72-80 [Periódico revisado por pares]The Institution of Engineering and TechnologyTexto completo disponível |
4 |
Material Type: Artigo
|
![]() |
Effect of BESS Response on Frequency and RoCoF During Underfrequency TransientsBrogan, Paul Vincent ; Best, Robert J. ; Morrow, D. John ; McKinley, Kenneth ; Kubik, Marek L.IEEE transactions on power systems, 2019-01, Vol.34 (1), p.575-583 [Periódico revisado por pares]New York: IEEETexto completo disponível |
5 |
Material Type: Artigo
|
![]() |
Determination of the optimal installation site and capacity of battery energy storage system in distribution network integrated with distributed generationXiao, Jun ; Zhang, Zequn ; Bai, Linquan ; Liang, HaishenIET generation, transmission & distribution, 2016-02, Vol.10 (3), p.601-607 [Periódico revisado por pares]The Institution of Engineering and TechnologyTexto completo disponível |
6 |
Material Type: Artigo
|
![]() |
Economic scheduling model of microgrid considering the lifetime of batteriesLiu, Chunyang ; Wang, Xiuli ; Wu, Xiong ; Guo, JingliIET generation, transmission & distribution, 2017-02, Vol.11 (3), p.759-767 [Periódico revisado por pares]The Institution of Engineering and TechnologyTexto completo disponível |
7 |
Material Type: Artigo
|
![]() |
Optimal scheduling of virtual power plant with battery degradation costZhou, Bin ; Liu, Xi ; Cao, Yijia ; Li, Canbing ; Chung, Chi Yung ; Chan, Ka WingIET generation, transmission & distribution, 2016-02, Vol.10 (3), p.712-725 [Periódico revisado por pares]The Institution of Engineering and TechnologyTexto completo disponível |
8 |
Material Type: Artigo
|
![]() |
Evaluation of Emerging Modular Multilevel Converters for BESS ApplicationsSoong, Theodore ; Lehn, Peter W.IEEE transactions on power delivery, 2014-10, Vol.29 (5), p.2086-2094 [Periódico revisado por pares]New York: IEEETexto completo disponível |
9 |
Material Type: Artigo
|
![]() |
Development of a 500-kW Modular Multilevel Cascade Converter for Battery Energy Storage SystemsKawakami, Noriko ; Ota, Satoru ; Kon, Hironobu ; Konno, Shuji ; Akagi, Hirofumi ; Kobayashi, Hiromu ; Okada, NaotakaIEEE transactions on industry applications, 2014-11, Vol.50 (6), p.3902-3910 [Periódico revisado por pares]New York: IEEETexto completo disponível |
10 |
Material Type: Artigo
|
![]() |
Using Energy Storage to Manage High Net Load Variability at Sub-Hourly Time-ScalesO'Dwyer, Ciara ; Flynn, DamianIEEE transactions on power systems, 2015-07, Vol.30 (4), p.2139-2148 [Periódico revisado por pares]IEEETexto completo disponível |