Result Number | Material Type | Add to My Shelf Action | Record Details and Options |
---|---|---|---|
1 |
Material Type: Capítulo de Livro
|
![]() |
Case Study C Design Management Tools for Concurrent ConstructionRaveala, Jarmo Antero ; Kruus, Matti ; Kiiras, Juhani Prins, Matthijs ; Emmitt, Stephen ; den Otter, AdArchitectural Management, 2009, p.135-154Oxford, UK: Wiley‐BlackwellTexto completo disponível |
2 |
Material Type: Capítulo de Livro
|
![]() |
Cyber concurrent manufacturing integrated with process engineering and 3d-cg simulation -product design, production system design, and workstation system design as a case study on “curtain wall” construction workTamaki, KinyaMechatronics for Safety, Security and Dependability in a New Era, 2006, p.293-296Elsevier LtdTexto completo disponível |
3 |
Material Type: Dataset
|
![]() |
The Digital Archive as an Inclusive Tool for Knowledge Construction through Design Practices_List of Case studiesBosco, Alessandra ; Bulegato, Fiorella ; Gasparotto, SilviaZenodo 2023Texto completo disponível |
4 |
Material Type: Artigo
|
![]() |
Assessing contract management as a strategic tool for achieving quality of work in Ghanaian construction industry: A case study of FPMU and MMDAsColeman, Emmanuel ; Nooni, Isaac Kwesi ; Fianko, Samuel Korenteng ; Dadzie, Linka ; Neequaye, Ebenezer Nickson ; Owusu-Agyemang, Jasmine ; Ansa-Asare, Edna ObuoJournal of financial management of property and construction, 2020-01, Vol.25 (1), p.41-60 [Periódico revisado por pares]Bingley: Emerald Group Publishing LimitedTexto completo disponível |
5 |
Material Type: Artigo
|
![]() |
Using BIM as a lean management tool in construction processes – A case studyAhmed.M. Eldeep ; Moataz.A.M. Farag ; L.M. Abd El-hafezAin Shams Engineering Journal, 2022-03, Vol.13 (2), p.101556 [Periódico revisado por pares]ElsevierTexto completo disponível |
6 |
Material Type: Ata de Congresso
|
![]() |
Design for environment tools for management decision making: a selected case studyLashbrook, W. ; O'Hara, P. ; Dance, D. ; Veltri, A.Proceedings of the 1997 IEEE International Symposium on Electronics and the Environment. ISEE-1997, 1997, p.99-104IEEETexto completo disponível |
7 |
Material Type: Ata de Congresso
|
![]() |
A case study for the Ecovillage at Currumbin-integrated water management planning, design and constructionTanner, C J ; Tite, B ; Reedman, TWIT Transactions on Ecology and the Environment, 2007, Vol.I, p.33-41Texto completo disponível |
8 |
Material Type: Artigo
|
![]() |
Improvement Management Tools in the Construction Industry: Case Study of MexicoDelgado-Hernandez, David Joaquín ; Cruz-Cruz, Cynthia Chrystell ; Vences-García, Pedro YairJournal of construction engineering and management, 2017-04, Vol.143 (4) [Periódico revisado por pares]American Society of Civil EngineersTexto completo disponível |
9 |
Material Type: Artigo
|
![]() |
Application of project management tools in construction phases to optimize the impact on quality, cost, and time: A case studySchneider, Roland ; Domsitzova, Monika Kotrasová, K. ; Safaei, B. ; Katunský, D. ; Zeleňáková, M.E3S web of conferences, 2024, Vol.550, p.1047 [Periódico revisado por pares]EDP SciencesTexto completo disponível |
10 |
Material Type: Artigo
|
![]() |
A Bayesian network for selecting improvement management tools to increase customer satisfaction in the construction industry: case study of MexicoDelgado-Hernández, David Joaquín ; Palacios-Navarro, Ulises JairoEngineering, construction, and architectural management, 2024-06, Vol.31 (7), p.2900-2915 [Periódico revisado por pares]Texto completo disponível |